Executive Summary Every ocean shipment headed for the United States, other than bulk cargo, requires an Importer Security Filing (ISF), commonly called “10+2.” Under 19 CFR Part 149, the ISF Importer, meaning the party causing the goods to arrive in a U.S. port by vessel, or its authorized agent must transmit ten data elements to CBP electronically and in English. Eight of them are due no later than 24 hours before the cargo is laden aboard the vessel at the foreign port; the remaining two, container stuffing location and consolidator, are due no later than 24 hours before arrival in a U.S. port. Four of the early elements (manufacturer, ship-to party, country of origin, and HTSUS number) may be filed on a best-available basis and updated later. Cargo that only passes through the United States uses a five-element ISF. The “+2” are the ocean carrier’s vessel stow plan and container status messages. The ISF Importer must have a qualifying bond, and a default on ISF obligations under a basic importation and entry bond carries liquidated damages of $5,000 for each violation (19 CFR 113.62(j)). This guide explains each element, the timing rules, the bond, and the filing errors that most often lead to claims.
Complete Guide to Importer Security Filing (ISF 10+2): Data Elements, Timing, Bonds, and Common Penalty Triggers
(进口商安全申报(ISF 10+2)完整指南:数据要素、时限、保证金与常见罚则触发点)
1 · What the ISF Is and Who Files It
Purpose
The ISF is advance cargo security data. CBP receives it before cargo is loaded abroad so that it can assess risk before the vessel sails, rather than after the goods arrive. It is separate from the customs entry, which concerns admissibility, duties, and release; an ISF does not clear goods through customs, and a customs entry does not replace the ISF. The regulations were issued as CBP Dec. 08-46 in November 2008, with a compliance date of January 26, 2010 (19 CFR 149.2(g)).
Which Shipments Require an ISF
| Shipment | ISF Requirement |
|---|---|
| Containerized cargo arriving by vessel for entry or FTZ admission | Full ISF (10 elements) |
| Break bulk cargo (packaged or bundled, not containerized) | Full ISF, with its own timing provisions (19 CFR 149.4) |
| Bulk cargo (loose, homogeneous cargo such as oil, grain, coal, ore, lumber, steel beams) | Exempt (19 CFR 149.4(a)) |
| Foreign cargo remaining on board (FROB) | Five-element ISF, filed by the carrier or NVOCC |
| Immediate exportation (IE) and transportation and exportation (T&E) in-bond | Five-element ISF |
| Air, truck, rail, and international mail | Not ISF; other advance data programs apply |
The ISF Importer
Under 19 CFR 149.1(a), the ISF Importer is the party causing goods to arrive within the limits of a U.S. port by vessel. For most shipments, that is the goods’ owner, purchaser, or consignee, or an agent such as a licensed customs broker. For IE, T&E, and FTZ shipments, it may also be the party filing that documentation. For FROB cargo, it is the carrier or NVOCC. The U.S. Postal Service is not an ISF Importer.
The ISF Importer may use an authorized agent to transmit the filing (19 CFR 149.5). The agent must retain the power of attorney in English until it is revoked, and keep revoked powers of attorney for five years. Legal responsibility for an accurate and timely ISF, however, remains with the ISF Importer.
⚠️ Critical Takeaway: The ISF is a security filing tied to the vessel voyage, not to the customs entry. A shipment can be fully cleared on the entry side and still generate an ISF violation if the advance data was late or wrong.
2 · The Ten Importer Data Elements
The Elements and Their Deadlines
Under 19 CFR 149.3(a), the elements must be provided for each good, listed at the six-digit HTSUS level, at the lowest bill of lading level (the house bill, where there is one). Manufacturer, country of origin, and HTSUS number must be linked to one another at the line-item level.
| # | Element | What the Regulation Requires | Due |
|---|---|---|---|
| 1 | Seller | Name and address of the last known entity that sold or agreed to sell the goods (or the owner, if not purchased) | 24 hours before lading |
| 2 | Buyer | Name and address of the last known entity to which the goods are sold or agreed to be sold (or the owner) | 24 hours before lading |
| 3 | Importer of record number / FTZ applicant ID | IRS number, EIN, SSN, or CBP-assigned number of the party liable for duties (or of the FTZ filer) | 24 hours before lading |
| 4 | Consignee number(s) | IRS number, EIN, SSN, or CBP-assigned number of the party in the U.S. on whose account the goods are shipped | 24 hours before lading |
| 5 | Manufacturer (or supplier) | Entity that last manufactures, assembles, produces, or grows the goods, or the party supplying the finished goods in the country of export; alternatively, the manufacturer used for the entry MID | 24 hours before lading (flexible) |
| 6 | Ship-to party | First party scheduled to physically receive the goods after release from customs custody | 24 hours before lading (flexible) |
| 7 | Country of origin | Country of manufacture, production, or growth under U.S. rules | 24 hours before lading (flexible) |
| 8 | Commodity HTSUS number | At least six digits; may be up to ten | 24 hours before lading (flexible) |
| 9 | Container stuffing location | Physical location(s) where the goods were stuffed (or made “ship ready” for break bulk) | 24 hours before U.S. arrival |
| 10 | Consolidator (stuffer) | Party that stuffed the container or arranged the stuffing | 24 hours before U.S. arrival |
Source: 19 CFR 149.2(b) and 149.3(a). For elements 1, 2, 5, 6, 9, and 10, a widely recognized commercial identification number may be provided in lieu of name and address.
The Flexible Elements
For elements 5 through 8, 19 CFR 149.2(f) allows an initial submission based on the best data available at the time. The filer must update these elements as soon as more precise information is available, and no later than 24 hours before arrival at a U.S. port (or upon lading, for a foreign port less than 24 hours’ voyage away).
Elements That Overlap With the Entry
Some ISF elements are also used for the customs entry, and differences between the two are a common source of questions:
| ISF Element | Relationship to Entry Data |
|---|---|
| Importer of record number | Identifies the party liable for duties; ties to the IOR’s CBP Form 5106 record |
| Manufacturer | May be reported as the same party used to build the entry’s manufacturer identification (MID) |
| HTSUS number | Required at six digits for the ISF; usable for entry purposes only if provided at ten digits by the IOR or its licensed broker |
| Country of origin | Determined under the same U.S. rules that govern the entry |
Verification of Information Received From Others
ISF data often comes from suppliers, forwarders, and consolidators overseas. 19 CFR 149.2(c) provides that, where the filer receives information from another party, CBP will consider how the filer obtained it under ordinary commercial practice and whether the filer was able to verify it; where reasonable verification is not possible, the filer may present the information on the basis of what it reasonably believes to be true.
⚠️ Critical Takeaway: Eight of the ten elements are due before the container is loaded abroad. In practice, that means the data has to come from overseas parties days before the U.S. side sees the goods.
3 · The Five-Element ISF for Cargo Passing Through
For shipments consisting entirely of FROB, and for cargo moving in-bond as IE or T&E, 19 CFR 149.3(b) requires five elements, also at the six-digit HTSUS level and the lowest bill of lading level:
| # | Element | Description |
|---|---|---|
| 1 | Booking party | Party that initiated the reservation of cargo space |
| 2 | Foreign port of unlading | Port code at the intended final destination |
| 3 | Place of delivery | City code for the place of delivery |
| 4 | Ship-to party | First party scheduled to receive the goods after release from customs custody |
| 5 | Commodity HTSUS number | At least six digits |
| Shipment Type | Due |
|---|---|
| FROB | Before lading aboard the vessel at the foreign port |
| IE and T&E | No later than 24 hours before lading at the foreign port |
Cargo that moves through U.S. ports for later export, including some routings discussed in our comparison of West Coast and Chicago gateways, may fall under these provisions depending on how it is declared.
4 · The “+2”: Carrier Requirements
The two additional elements are the ocean carrier’s responsibility and sit in CBP’s vessel regulations rather than in Part 149.
| Requirement | What It Is | Timing |
|---|---|---|
| Vessel stow plan | The position of each container on the vessel | Generally within 48 hours after departure from the last foreign port; before arrival for shorter voyages |
| Container status messages (CSMs) | Event messages on container movements and status changes, such as loading, discharge, and gate moves | No later than 24 hours after the event is entered in the carrier’s equipment tracking system |
Importers do not file the “+2,” but container status data helps CBP match containers to the ISF, which is one reason ISF data must be linked correctly to the bill of lading.
5 · Timing in Practice
Two Clocks
| Clock | Elements | Anchor Event |
|---|---|---|
| Before lading | Elements 1–8 (with 5–8 updatable) | Cargo laden aboard the vessel at the foreign port |
| Before arrival | Elements 9–10, and final updates to 5–8 | Arrival at a U.S. port |
An Illustrative Timeline
| Event | Illustrative Time | ISF Status |
|---|---|---|
| Container stuffed at a supplier’s factory or a consolidation warehouse | Day 1 | Stuffing location and consolidator become known |
| ISF filed with elements 1–8 | By Day 3, 08:00 | Must be on file 24 hours before loading |
| Container loaded at the foreign port | Day 4, 08:00 | Deadline for elements 1–8 has passed |
| Vessel sails; transpacific voyage | Days 4–18 | Updates to elements 5–8 as information improves |
| Final updates and elements 9–10 | By Day 17, 08:00 | 24 hours before U.S. arrival |
| Vessel arrives at a U.S. port | Day 18, 08:00 | ISF complete; entry proceeds separately |
Illustrative only. The lading time controls the first deadline, and booking changes, rollovers, and transshipments can move it.
Updates and Withdrawals
Two further obligations often surprise importers:
- Update. If any information changes, or more accurate information becomes available, before the goods arrive in a U.S. port, the filer must update the ISF (19 CFR 149.2(d)).
- Withdrawal. If, after filing, the goods are no longer intended to be imported into the United States, the filer must withdraw the ISF and give CBP the reason (19 CFR 149.2(e)).
⚠️ Critical Takeaway: An ISF is not a one-time submission. It must be kept accurate until arrival, and withdrawn if the goods will not come.
6 · The Bond Requirement
Which Bonds Qualify
Under 19 CFR 149.5(b), the ISF Importer must have one of the following:
| Bond | Typical Holder |
|---|---|
| Basic importation and entry bond (19 CFR 113.62; Activity Code 1) | Importers of record |
| Basic custodial bond (19 CFR 113.63) | Bonded carriers, warehouses, CFS operators |
| International carrier bond (19 CFR 113.64) | Carriers and NVOCCs |
| Foreign trade zone operator bond (19 CFR 113.73) | FTZ operators |
| Importer security filing bond (Appendix D to Part 113; Activity Code 16) | ISF Importers without another applicable bond |
If the ISF Importer does not have a required bond, the agent submitting the ISF may post the agent’s bond. CBP’s guide to setting bond amounts lists minimums for a stand-alone ISF bond of $50,000 (continuous) and $10,000 (single transaction). Our guide to U.S. customs bonds explains how these bond types work.
What the Bond Promises
The basic importation and entry bond contains a specific ISF condition. Under 19 CFR 113.62(j), the principal agrees to comply with all ISF requirements in Part 149, and, if the principal defaults with regard to any obligation, the principal and surety agree to pay liquidated damages of $5,000 for each violation.
7 · Liquidated Damages and Common Triggers
How Claims Arise
CBP assesses ISF liquidated damages against the bond. CBP’s mitigation guidelines, issued in 2009, address claims for late ISFs, inaccurate ISFs, inaccurate updates, and failure to withdraw, and provide for mitigation or cancellation in certain circumstances. CBP moved from a period of flexible enforcement to issuing liquidated damages claims for ISF violations in 2013. Because claims are assessed by violation, a recurring process problem can produce multiple claims across many shipments.
Common Triggers
| Trigger | How It Typically Happens |
|---|---|
| Late filing | Supplier or forwarder data arrives after the container is booked or loaded; booking changes move the lading time earlier than expected |
| No filing | Each party assumes another (supplier, forwarder, broker) is filing |
| Missing elements 9–10 | Stuffing location and consolidator are not provided before arrival, especially for consolidated LCL cargo |
| Flexible elements not updated | Best-available data for manufacturer, ship-to, origin, or HTSUS is never replaced with final data |
| Bill of lading mismatch | The ISF is linked to the wrong master or house bill, or the house bill number changes |
| Inconsistent manufacturer, origin, or HTSUS | The ISF line-item data does not correspond to what is later declared on the entry |
| Wrong IOR or consignee number | Numbers not matching the parties’ CBP records |
| Failure to withdraw | Shipment is cancelled or diverted to another country, but the ISF remains on file |
| Inaccurate update | A correction introduces a new error |
Beyond Monetary Claims
ISF data feeds CBP’s risk assessment. Late, missing, or inconsistent data can also affect how a shipment is targeted on arrival, including the likelihood of holds or examinations, which carry their own time and cost.
⚠️ Critical Takeaway: Most ISF violations are process failures rather than intentional misstatements: unclear responsibility, late data from overseas, and data that is never updated.
8 · How Current Developments Touch the ISF
The Foreign Importer of Record Rule
CBP’s interim final rule on foreign importers of record, effective January 5, 2027, does not amend Part 149. It does, however, affect the parties whose numbers appear on the ISF. The importer of record number reported on the ISF identifies the party liable for duties, and under the new rule that party must be classified as a U.S. or foreign IOR when the entry is filed. Exporters and importers reviewing their IOR arrangements under the rule, as discussed in our analysis for Chinese and Vietnamese exporters, commonly align the IOR and consignee numbers on the ISF with the same records.
Lunar New Year and Peak Booking Periods
Late ISF filings tend to cluster where bookings change quickly, such as before Lunar New Year, when cargo is rolled or moved to earlier sailings. Our Q1 2027 planning analysis covers the 2027 calendar.
9 · Practical Considerations
The following points are commonly reviewed by importers, exporters, and logistics providers. They are offered for information, not as a checklist.
Defining Who Files
A written allocation of responsibility among the importer, the overseas supplier or forwarder, and the U.S. broker, including who holds the power of attorney and whose bond is used, avoids the “each party thought another was filing” problem.
Building the Data Flow From Origin
Because most elements are due before lading, the data path from supplier and consolidator to the filer is usually the critical link. Some importers ask suppliers to provide ISF data at booking rather than at shipment.
Monitoring Status After Filing
Filers commonly confirm that each ISF has been accepted and matched to the bill of lading, and track the flexible elements and elements 9–10 until arrival.
Keeping ISF and Entry Data Consistent
Using the same product master data for the ISF and the entry, including manufacturer, country of origin, and HTSUS number, reduces discrepancies between the two filings.
Handling Changes
Cancellations, diversions, and booking changes are the points where withdrawals and updates are most often missed.
⚠️ Critical Takeaway: A reliable ISF process depends less on the filing itself than on who provides the data, when, and how changes are communicated.
10 · Conclusion: Advance Data, Before the Ship Sails
The Importer Security Filing asks for a small set of data elements, but on a demanding schedule: most of it before the cargo is loaded abroad, the rest before it arrives, and all of it kept accurate until arrival. Because a qualifying bond backs the filing and each violation can carry a $5,000 claim, the ISF is as much a process discipline as a data requirement.
Key Takeaways
| Factor | Detail |
|---|---|
| Regulation | 19 CFR Part 149 (CBP Dec. 08-46); compliance date January 26, 2010 |
| Who Files | ISF Importer (party causing goods to arrive by vessel) or authorized agent |
| Exempt | Bulk cargo |
| Elements 1–8 | Seller, buyer, IOR/FTZ number, consignee number, manufacturer, ship-to, country of origin, HTSUS (6-digit): 24 hours before lading |
| Flexible Elements | 5–8 may be filed on best-available data and updated no later than 24 hours before U.S. arrival |
| Elements 9–10 | Container stuffing location and consolidator: 24 hours before U.S. arrival |
| Five-Element ISF | FROB, IE, and T&E cargo |
| Carrier “+2” | Vessel stow plan and container status messages |
| Data Level | Each good at 6-digit HTSUS, at the lowest bill of lading level |
| Bond | Required (19 CFR 149.5(b)); agent’s bond may be used if the ISF Importer has none |
| Liquidated Damages | $5,000 per violation under the basic importation and entry bond (19 CFR 113.62(j)) |
| Ongoing Duties | Update when information changes; withdraw if goods will not be imported |
The Bottom Line
For importers and exporters moving cargo to the United States by ocean, the ISF is the first CBP filing in the life of a shipment and often the one that depends most on parties outside the United States. Clear responsibility, an early data flow from origin, and consistent product data between the ISF and the entry are what keep it on time and accurate. Businesses that would like support with ISF filing, bonds, or customs entry may find it useful to work with a licensed customs broker and logistics partner that manages both the origin data flow and the U.S. filing.
The message is clear: the ISF requires ten data elements from the importer side, eight before the cargo is loaded abroad and two before it arrives, backed by a bond that carries $5,000 in liquidated damages for each violation.
This analysis reflects 19 CFR Part 149 (Importer Security Filing), including §§ 149.1, 149.2, 149.3, 149.4, and 149.5; the basic importation and entry bond conditions at 19 CFR 113.62; CBP’s A Guide for the Public: How CBP Sets Bond Amounts (Publication 3569-0224); and CBP’s interim final rule “Heightened Requirements for Foreign Importers of Record” (91 FR 69977). Regulatory text is summarized; the published regulations govern. Information is current as of November 2026. Organizations should consult with licensed customs brokers and customs counsel for guidance tailored to their specific shipments and filing arrangements.